A solar power project on an industrial building in Germany, 2023
We carried out the installation of a solar power plant on the roof of an industrial building with PVC cladding in Germany. We successfully assembled the structures, installed the modules, installed the electrical parts and connected the substations.
YEAR | COUNTRY | POWER | PROJECT DURATON |
---|---|---|---|
2023 | Germany | 3,5 MW | 4 months |
YEAR
2023
COUNTRY
Germany
POWER
3,5 MW
PROJECT DURATON
4 months