Solar power project on a warehouse building in Germany, 2023
We have carried out the installation of a solar power plant on the roof of a warehouse building with PVC cladding in Germany. We successfully assembled the structures, installed the modules, installed the electrical parts and connected the substations.
YEAR | COUNTRY | POWER | PROJECT DURATION |
---|---|---|---|
2023 | Germany | 1 MW | 1,5 months |
YEAR
2023
COUNTRY
Germany
POWER
1 MW
PROJECT DURATION
1,5 months
![](https://rndv.eu/app/uploads/2023/07/AdobeStock_259947006-1024x768.jpeg)